A track record peer-reviewed in production.

PaperGuru-assisted manuscripts have been formally accepted at top-tier venues across software engineering, machine learning, and engineering informatics — with thirty more under active review.

10
Accepted
5
Top Venues
30+
Under Review
Section 01 / Honors

A trophy case, quietly accumulating.

Each badge corresponds to a peer-reviewed publication. Tier reflects venue prestige — Diamond marks CCF-A flagships; Platinum marks top-tier specialized journals; Gold marks emerging proceedings.

FSE 2026 badge
Diamond★★★
FSE 2026
ACM · CCF-A
5 papers accepted
ICML 2026 badge
Diamond★★★
ICML 2026
CCF-A · ML Flagship
1 paper accepted
TOSEM 2026 badge
Diamond★★★
TOSEM 2026
ACM Trans. · CCF-A
2 articles accepted
AEI 2026 badge
Platinum★★
AEI 2026
Elsevier · SCI Q1
1 minor revision
ICoGB 2026 badge
Gold
ICoGB 2026
Civil Engineering
1 paper accepted
Section 02 / Evidence

Acceptance, on the record. Redacted but real.

Authentic notification screenshots, with author identities, paper IDs, and titles redacted for double-blind anonymity. All metadata verifiable on request.

FSE 2026 · IVRfse badge
Accepted
Accepted
FSE 2026 · IVR
Industry & Viz Research track.
First of three IVR-track acceptances in the cycle.
FSE 2026 · IVRfse badge
Accepted
Accepted
FSE 2026 · IVR
Second IVR-track paper.
Same cycle, second IVR notification.
FSE 2026 · IVRfse badge
Accepted
Accepted
FSE 2026 · IVR
Third IVR-track paper.
Three-of-three IVR sweep, single submission cycle.
FSE 2026 · Posterfse badge
Accepted
Accepted
FSE 2026 · Poster
Poster track accepted.
First of two FSE poster contributions.
FSE 2026 · Posterfse badge
Accepted
Accepted
FSE 2026 · Poster
Second poster accepted.
Two-of-two poster contributions, same cycle.
ICML 2026 · Mainicml badge
Accepted
Accepted
ICML 2026 · Main
Long paper to main proceedings.
Camera-ready completed after triple-blind review.
ICoGB 2026 · Civilicogb badge
Accepted
Accepted
ICoGB 2026 · Civil
Green-building methodology.
Cross-disciplinary application of PaperGuru.
tosem badge
Accepted
Accepted
TOSEM · EMBARGO
2 articles under embargo.
— ACM Trans. on SE & Methodology
TOSEM · CCF-A
Two journal articles accepted.
Screenshots withheld per ACM embargo policy.
Section 03 / Pipeline

Thirty manuscripts, moving through review.

Live pipeline across NeurIPS, CCS, and adjacent venues. Screens are partially blurred to protect double-blind identities while preserving process visibility.

Triple-blind readyRolling responsesMetadata redacted
~20
NeurIPS 2026
~10
CCS 2026
30+
Total in pipeline
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
NeurIPS
CCS
CCS
CCS
CCS
CCS
CCS
Open CapacityStart your next submission

Snapshot updates weekly as new decisions arrive.

Venues shown: NeurIPS, CCS, and targeted follow-up tracks.

Section 04 / Trajectory

From submission to citation.

A condensed view of the recent track record — ordered by notification date.

May 2026 · Latest
FSE 2026 · 5 papers accepted
Three IVR-track and two poster-track contributions in a single submission cycle.
Apr 2026
ICML 2026 · main track
Long paper accepted after triple-blind review. Camera-ready completed.
Mar 2026
TOSEM · 2 articles accepted
ACM Transactions on Software Engineering and Methodology — currently under publication embargo.
Feb 2026
AEI 2026 · minor revision accepted
Advanced Engineering Informatics (Elsevier, SCI Q1) — minor revision returned and accepted.
Jan 2026
ICoGB 2026 · proceedings
Cross-disciplinary green-building paper accepted to proceedings.
Now
30+ manuscripts under active review
NeurIPS 2026, CCS 2026, plus venue-specific extensions in preparation.